The Changi Boardwalk was conceptualized by the Urban Redevelopment Authority (URA) as part of the Singapore Green Plan 2012. The 2.6 kilometer Eastern boardwalk was designed to connect the existing Western boardwalk from the Changi Village all the way to the Changi Beach Club. Extensive amount of GFRC simulated timber was used on the boardwalks and piling works in the waterways for the footpath. Our scope includes the hardscape & lighting installation.