Bidadari Estate
Construction of park facilities such as elevated boardwalk, walkway, trail, shelters, toilets/restroom, car park, bio swale, etc. Hardscape and softscape works, electrical and mechanical engineering works.
Construction of park facilities such as elevated boardwalk, walkway, trail, shelters, toilets/restroom, car park, bio swale, etc. Hardscape and softscape works, electrical and mechanical engineering works.
Existing Asiatic Black Bear, Seladang Temporary Holding, Bearded Pig and Red Dhole enclosure and back of house area are to be demolished and a new Bull Elephant (Chawang), Seladang and Axis Deer enclosure, including exhibit area and back of house area shall be constructed.
Reconstruction of Cashin house includes jetty and erection of new toilet block which involves architectural, structural, M&E and environmental works. External Works consisting of felling of specified trees, earthworks to form new profile, widening and re-surfacing of existing driveways, construction of retaining walls, chain-link fencing and close turfing to general areas, etc
Construction of boardwalk including necessary works such as site clearance and planting and transplanting works. Electrical works for the boardwalk is also included in our scope.
Construction of park facilities such as pavilions, toilets, footpaths,etc. Hardscape and softscape works, and M&E works
Situated along Rifle Range Road to the south of Bukit Timah Nature Reserve, Rifle Range Nature Park is 66 hectares and serves as a green buffer to protect Bukit Timah Nature Reserve from edge effects and abutting developments. It enhances ecological connectivity and provides complementary habitats for the Nature Reserve’s biodiversity. It is also Singapore’s…
Esplanade Mall Connected to Esplanade Mall, the horseshoe-shaped courtyard that features alfresco dining areas doubles as a performance space, leading to the Outdoor Theatre by the waterfront. The Lawn is a pleasant dash of green along the waterfront that connects the Courtyard, Outdoor Theatre and the Singtel Waterfront Theatre. This green space extends to the…
TERM CONTRACT FOR THE DEVELOPMENT AND UPGRADING WORKS IN PARKS AND OPEN SPACES BY NATIONAL PARKS BOARD FOR A PERIOD OF THREE (3) YEARS Term Contract for the Development and Upgrading Works in Parks and Open Spaces by National Parks Board for a Period of Three (3) Years _____________________________________________________________________________________________________________________________ Name of Client : …
Proposed Development of Integrated Park Project at Bidadari Estate